COMMERCIAL Portfolio
Renown Mail-Order Pharmacy Tenant Improvement
This second-floor tenant improvement converted existing space in an operating support-services building into a dedicated mail-order pharmacy environment with offices, staff areas, casework, glazing, MEP upgrades, ceilings, lighting, and finishes. PB coordinated construction around ongoing operations while supporting infrastructure needs for specialized pharmacy automation equipment installed by others.
Renown NW Reno Urgent Care Clinic
A former retail space was converted into an urgent care clinic with exam rooms, a lab, and medical communication systems. Phased delivery allowed Renown to begin operations ahead of final X-ray equipment installation, overcoming lead time delays while maintaining healthcare performance and patient care standards.
Marvin West Coast Distribution Center
Marvin’s 113,400-square-foot Reno distribution center at Airway Commerce Center, constructed by Plenium Builders, supports Marvin’s West Coast expansion. Featuring a custom racking system, eco-conscious design, and modern office spaces, the facility improves logistics and enhances sustainability, underscoring collaboration and innovation.
Ramsay’s Kitchen and Gordon Ramsay Fish & Chips
Two new Gordon Ramsay restaurants—Ramsay’s Kitchen and Gordon Ramsay Fish & Chips—now energize The ROW in Reno. Plenium Builders tackled complex construction challenges, delivering elegant custom finishes, an open-concept bar, and British-themed designs. Built within an active casino, these vibrant spaces elevate Reno’s dining scene with world-class craftsmanship and immersive ambiance.
Horiba Instruments R&D Facility
HORIBA’s Nevada facility has evolved through a long-term design-build partnership. Over multiple phases, the team delivered cleanrooms, labs, mezzanines, and utility systems supporting the development of precision instruments for semiconductor and scientific use—completed with close coordination, technical rigor, and minimal disruption to ongoing operations.
City of Reno Development Services Department Offices
Plenium Builders remodeled a City Hall office for Reno’s Development Department, creating a brighter, more functional workspace. Updated finishes, flexible layouts, and collaborative meeting areas support both staff workflow and public service. The design reflects the Department’s role in guiding projects that shape Reno’s built environment.
Western Nevada Supply Offices
A remodel of the Blue Team’s two-story building created a modern, connected workspace linking sales, showroom, and service areas. Staged construction kept business uninterrupted. Features include custom millwork, barn door–style whiteboards, built-in ladders, and integrated AV systems, all supporting the team’s collaborative culture and reflecting current industry trends.
Jensen Infrastructure Headquarters
Jensen Infrastructure’s Reno headquarters unites leadership and operations in a vibrant, purpose-built space. Using design assist subcontractors for efficient coordination, the project was completed near budget and on schedule, supporting custom engineering, sales, ecommerce, and client services in a flexible, light-filled environment that reflects the company’s brand and values.
Hilton Vacation Club Tahoe Seasons Renovation Ph 2
Renovated guest suites received fresh finishes, ADA upgrades, and system improvements as part of a larger phased update at this alpine resort. Work proceeded during live operations and required coordination around legacy infrastructure and occupancy demands—delivering comfortable, modernized spaces without disrupting the guest experience.
Northern Nevada Correctional Center compliance retrofit
This CMAR retrofit improved safety and accessibility code compliance across NNCC housing, medical, visitor, restroom, shower, program, and support areas. Working for SPWD on behalf of NNCC, Plenium Builders helped plan and sequence construction around security protocols, occupied operations, tool control, shutdowns, and durable correctional-grade accessibility requirements.